Record
| Field | Value | Canonical record |
|---|---|---|
| Claim type | Integrated package assurance | — |
| Classification | PUBLIC | — |
| Reviewer class | repository-automated | — |
| Certification status | Not independent certification | — |
| Test environment | Local static build, system Chromium harness and isolated Apache AllowOverride FileInfo profile | — |
| Publication date | 2026-08-06 | — |
Method and result
Method: Aggregate acceptance requires EVI-AE-017 through EVI-AE-021, reciprocal review and coverage records, valid expiry schedules, closed change-impact records, zero required validation errors and deterministic archive replay before delivery.
Result: PASS for the accepted local release package.
Supporting evidence
EVI-AE-017— Version 1.7.0 structural validation evidence statementEVI-AE-018— Version 1.7.0 browser smoke evidence statementEVI-AE-019— Version 1.7.0 Apache shared-host evidence statementEVI-AE-020— Version 1.7.0 source, report and review-governance evidence statementEVI-AE-021— Version 1.7.0 release-source inventory evidence statement
Limitations
- No live eviulon.com host, production telemetry, operational Evulgare system or field performance was tested.
- Repository automation is not independent certification.
- The final ZIP checksum and archive replay are reported outside the archive.
Relationships
System: EVI-SYS-EVULGARE-001 — Evulgare
Doctrine: EVI-DEF-001, EVI-CI-001, EVI-DR-003
Supersedes
Superseded by
Review, coverage and expiry
Validity and invalidation
- Any post-evidence change to public routes, schemas, generated data, review or coverage records, expiry policy, assets, host rules, source reports or release inventory.
- Any required review reaches its due date without completion or successor evidence.
- Any use of this package claim as evidence of live readiness, operational deployment, legal approval or independent certification.
Revision history
| Revision | Date | Change |
|---|---|---|
| 1.0 | Published the bounded v1.7.0 integrated acceptance claim with a six-month evidence validity and review schedule. | |
| 1.1 | Superseded by EVI-AC-020 after reviewer, authority, conflict, research and public-content changes expanded the v1.8.0 scope. |
Authority and record status
Responsible authority: National Engineering Directorate.
This claim is governed by EVI-PRO-015 and is explicitly not independent certification.
Revision date: . Public corrections may be initiated through the diplomatic contact route.