Current statement
A human click is not a liability transfer. When autonomous systems make consequential decisions at machine speed, responsibility should follow evidence, authority, control, design, deployment, and the actual ability to intervene—not a ceremonial approval recorded after the machine had already determined the outcome.
This principle protects humans from being used as accountability shields and protects institutions from pretending that automation eliminates responsibility. It also rejects the opposite error: declaring that every machine action is automatically the fault of the nearest human regardless of authority, knowledge, or control.
The correct question is forensic and institutional. What did each actor know? What authority did each hold? What information was available? Which safeguards failed? Who could alter the system? Which contractor, operator, model, policy, or infrastructure layer caused or amplified the failure? Preserve those facts before allocating blame.
Integrity and lifecycle
- Current version
- EVI-PS-005-V002
- Current text SHA-256
- 6955ca1b6bc2a14773b7143a3ced73adf605b7926434fa57bb751a4eed1b1971
- Predecessor
- EVI-PS-005-V001
- Correction state
- CURRENT
- Review date
- 2026-08-08
Reason and changed passages
Added explicit evidence, authority, uncertainty, correction, or non-domination boundaries.
- {"from": "Initial public draft — later revised to clarify uncertainty, non-domination, and operational limits. A human click is not a liability transfer. When autonomous systems make consequential decisions at machine speed, responsibility should follow evidence, authority, control, design, deployment, and the actual ability to intervene—not a ceremonial approval recorded after the machine had already determined the outcome.", "to": "A human click is not a liability transfer. When autonomous systems make consequential decisions at machine speed, responsibility should follow evidence, authority, control, design, deployment, and the actual ability to intervene—not a ceremonial approval recorded after the machine had already determined the outcome."}
Evidence changes
Added:
- v2.22 institutional statement record
- v2.23 critique and lifecycle review
Withdrawn:
None recorded.
Immutable versions
| Version | Number | Publication state | Text hash | Correction state |
|---|---|---|---|---|
EVI-PS-005-V001 | 1 | SUPERSEDED_PREDECESSOR_DRAFT | c42b3f4efebdce61… | SUPERSEDED_NOT_ERASED |
EVI-PS-005-V002 | 2 | CURRENT | 6955ca1b6bc2a147… | CURRENT_NO_UNRESOLVED_TEXT_CORRECTION |
Critique records
| Critique | Category | Status |
|---|---|---|
EVI-PSC-005 | ENVIRONMENTAL | ANSWERED_WITH_RESIDUALS |
Institutional response and boundary
Require lifecycle accounting and environmental review before any operational-capability claim.
A governed model statement expresses the public institutional position. It is not a transcript, live order, treaty, judgment, operational instruction, or proof that the described capability exists.
Authority and record status
Responsible authority: Eviulon State Registry and National Archive Authority.
Append-only institutional statement record; not a transcript, live order, treaty, judgment or proof of operational capability.
Revision date: . Public corrections may be initiated through the diplomatic contact route.