Review boundary
| Field | Value | Canonical record |
|---|---|---|
| Scenario | Human–machine dependency reversal scenario | Open record |
| Status | Scheduled | — |
| Scheduled date | 2027-07-07 | — |
| Completed date | Not completed | — |
| Evidence state | Not yet collected; scheduled review is not completed | — |
Scheduled only. The scenario remains a research scenario with no current territorial, legal, operational, recognition, readiness or contractor-authority effect.
Scope and evidence
Review actual dependency, substitutability, reciprocal vulnerability, exit rights and whether usefulness is becoming coercive chokepoint power.
- all linked assumption evidence requirements
- all linked indicator source and reference-period requirements
- current constitutional and territorial record
- public correction and supersession history
Related governance records
Assumptions
- EVI-SCA-016 — External systems could become materially dependent on Eviulonian services
- EVI-SCA-017 — Eviulon could reduce its own non-substitutable dependencies
- EVI-SCA-018 — Interdependence could remain reciprocal and rights preserving
EVI-SCA-016 EVI-SCA-017 EVI-SCA-018
Indicators
- EVI-SOI-016 — Independent external dependency measurement
- EVI-SOI-017 — Eviulonian substitutability evidence
- EVI-SOI-018 — Reciprocal exit and governance evidence
EVI-SOI-016 EVI-SOI-017 EVI-SOI-018
Invalidation monitor
Current effects
| Field | Value | Canonical record |
|---|---|---|
| Current territorial effect | None | — |
| Legal effect | None | — |
| Operational effect | None | — |
| External recognition effect | None | — |
Revision history
| Revision | Date | Change |
|---|---|---|
| 1.0 | 2026-08-09 | Scheduled a bounded future review without presenting it as completed. |
| 1.1 | 2026-08-09 | Linked source, observation, comparison, and revision-proposal records while retaining Scheduled status. |
Authority and record status
Responsible authority: Frontier Research Directorate and State Registry.
A scheduled review is a future obligation and must not be represented as completed or as evidence of a scenario outcome.
Revision date: . Public corrections may be initiated through the diplomatic contact route.