Review disposition
| Field | Value | Canonical record |
|---|---|---|
| Observation | EVI-PSO-010 | Open record |
| Status | Closed | — |
| Source role | EVI-SRCROLE-004 | Open record |
| Authority | EVI-AUT-002 | Open record |
| Reviewer role | EVI-REV-001 | Open record |
Read-only API documentation was observed; endpoint behavior, limits, and production completeness remain unverified.
Reviewed fields
- access
- accountRequired
- writeAccess
Staleness: Current observation
Dates
| Field | Value | Canonical record |
|---|---|---|
| Scheduled | Not applicable | — |
| Completed | 2026-08-07 | — |
| Next review | 2026-10-07 | — |
Limitations
- Observation only; no connector was activated and no credentials were forwarded.
- complete endpoint acceptance matrix
- rate limits
- private write interfaces
- production incident state
Unavailable
- private source state
- server logs
- unpublished editorial workflow
- independent certification
Authority and record status
Responsible authority: National Engineering Directorate and State Registry.
Review record only. The underlying observation remains separately preserved.
Revision date: . Public corrections may be initiated through the diplomatic contact route.